Monday 28 September 2015

What I Was Set To Do After Pitch

After our group pitching our first idea for the first time, we were given some constructive feedback for the idea. We then responded to that feedback and before re-pitching it again to Luke, each one of us got set different tasks to think about and construct from in order to come up with a stronger main idea for our re-pitch. I was assigned to think about the water sequence.

For the scene with the water we were thinking of filling up the room with ankle height water and have the dancer do her dance moves on the shallow water. We would then capture some of the splashes and put them in slow motion, which we thought was an awesome idea. However, Despite adding a lot of "spice" to our music video and being an idea that is do-able,  due to time constrains it is no longer in our music video. This is because it would take a lot of effort and consume a lot of time to flood the whole studio. Not to mention the time it would take to take all the cables and electronics out of the floor and probably taped to the wall over ankle height. Now if we were doing this water sequence for an extended period of time in our music video, then perhaps the idea would be considerable. However, since we decided as a group to only use that water sequence in one small sequence, and considering the fact that we only have one day to shoot the whole entire music video this idea has been scratched out.

No comments:

Post a Comment